Port Townsend School District
450 Fir Street
Port Townsend, WA 98368
360.379.4502
Port Townsend School District Linclon School Building
School Board Superintendent Staff Human Resources Special Programs Financial Services Maintenance and Operations

Management Support Policy 6923: Energy Conservation

In light of the increasing cost and dwindling supply of conventional energy sources, a life cycle cost analysis shall be required of each major construction project. A life cycle cost analysis shall include a description of:

  • Insulation and heat retention factors;
  • Variable occupancy and operating conditions to be incurred by the facility;
  • Overall supply and demand of the facility's energy system and actual or potential utilization of outside energy sources, such as climate;
  • Initial cost of energy plant; and
  • An energy consumption analysis comparing alternative energy systems.

As part of its commitment to energy conservation, the district shall consider the use of at least one renewable energy system such as solar energy, wind or wood or wood waste, geothermal, or other non-conventional fuels in any construction or renovation project.

Cross References: Policy 6810 Energy Management/Education
Legal References: RCW 39.35 Energy conservation in design of public facilities

ADOPTED: November 24, 2003

Last Updated 03.21.05