|
Port Townsend School District 450 Fir Street Port Townsend, WA 98368 360.379.4502 |
![]() |
||||||
![]() |
||||||||
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Management Support Policy 6923: Energy Conservation In light of the increasing cost and dwindling supply of conventional energy sources, a life cycle cost analysis shall be required of each major construction project. A life cycle cost analysis shall include a description of:
As part of its commitment to energy conservation, the district shall consider the use of at least one renewable energy system such as solar energy, wind or wood or wood waste, geothermal, or other non-conventional fuels in any construction or renovation project.
ADOPTED: November 24, 2003 |
|||||||
| Copyright © Web Development Wind's Eye Design | ||||||||